1986
In 1986, our company as the first company in China brought in micro-control FRP pipe and tank winding equipment from Vetroresina of Italy, which started the large-scale industrial production of FRP in domestic market, and be regarded as the landmark in Chinese FRP development history by China FRP Industrial Association.
-
1988
In 1998, when Premier Li Peng visited our company, put forward We are rich of quartz resource. Get fine materials by advanced technology and equipment, then "take plastic to replace steel" can be realized.
-
1989
In 1989, our company, also the first company, brought in site winding machine to resolve the transportation problem of large tank more than DN4000mm, and then the diameter the machine can make is up to 12000mm.
In 1989, based on French standard, our company designed and manufactured for French SB company the O4600×2730 ×51000“Scrubber Tower of Zhong’a Ammonium Phosphate Project”, FRP—PP O5500 separator, O1700×9500 Venturi dryer and O1400× 7300 Venturi scrubber.
In 1989, our company designed and manufactured the Chinese first DN4000 FRP jacket fermentation tank for Shijiazhuang “Zhenji Fermentation” Company.
-
1991
In 1991, to get more development, our company invested together with Sarplast of Italy and established a joint venture in 1993 named “Hebei Zhongyi GFRP Co.,Ltd” that possessed the advanced, Italia-produced and computer controlled RPMP production, FRP profile production line, FRP grating production line and FRP cable tensile core production line.
-
1994
In 1994, we, as the first one in FRP field in China, used “FEA” in the products design.
In 1994, we designed, manufactured and installed the Chinese first RPMP waterline for Water Supply Company, Daqing Petroleum Administration Bureau. This project adopted the RPMP with DN800mm and working pressure 0.6Mpa.
-
1995
In 1995, our company contracted the “Water Diversion into Beijing” Project issued by Beijing Water Resource Bureau. This project adopted the DN600mm, 700mm and 900mm RPMP, double lines were totally 46km.
-
1996
In 1996, our company designed and manufactured by ourselves the first G60 rail transportation tank identified by Railways Ministry and original Chemical Industry Ministry together.
-
1997
In 1997, we are the first company which obtained the ISO9001 certificate in FRP field. At the same time, we got the Quality Certificates of six countries, including China, Switzerland, French, USA, Holland and Germany.
-
1998
In 1998, our company contracted DN1200 RPMP with 33km for the first phase of Shishi water Diversion Project. The factory in Shishi, Fujian was established. ;
In 1998, Mr. Xi Jinping visited our Fujian Branch Company when he was deputy secretary of Fujian Province
In 1998, Mr. He Guoqiang visited our Fujian Branch Company when he was the governer of Fujian Province
-
2000
In 2000, our company designed and manufactured by ourselves the Chinese biggest so far RPMP production line of DN4000mm, and fabricated the first test pipe for South-to-North Water Diversion Project.
-
2001
At the end of 2001, the amount of one RPMP contract exceeded 100 million. Among them, Xiao Wa Cao Counter Siphone Engineering, as the important project of NDRC, adopted DN3100mm RPMP. This project has opened a new era for the application of long distance and big diameter RPMP at that time.
In 2001, RPMP of our company had been appointed as the exclusive product for Water Diversion Project from Qionghai to Boao, “Boao Forum for Asia”.
-
2004
In 2004, “Hao Hua Zhongyi GFRP Co., Ltd” was set up and the holding company is China Haohua Chemical (Group).
-
2006
In 2006, we contracted the FRP products in “Syria SYSCCO 75t/day ionic membrane sodium hydroxide Project” , and this was the first project we have done on foreign site.
-
2007
In 2007, Hangzhou Yaolin Branch Company was set up.
-
2009
In 2009, we began to cooperate with some international famous companies like “BASF” and “Andritz” supplying various FRP storage tanks for them.
-
2010
In 2010, we contracted the second phase of Shishi Water Diversion Project, the DN is 1600mm, and the double line was totally 60km. This created the highest record of single contract amount.
In 2010, our company successfully developed the FRP pressure jack pipe.
-
2012
In 2012, production base in Foshan, Guangdong was set up.
-
2013
In 2013, production base in Yanhu, Qinghai was set up.
-